Gatwick Diamond Development Drainage

Project Info

  • Project Value

    £358,000

  • Category

    Groundworks

Job Title

Gatwick Diamond Development Drainage, Manor Royal Crawley

Client

Willmott Dixon

Description

Willmott Dixon appointed as the main contractor to develop a large parcel of land on the Manor Royal Industrial Estate for the building of a prestigious office block. Hobart Paving Company carried out the drainage connections for the highway surface water gullies into the existing system via backdrop manholes.

Our qualified confined spaces drainage gang working at a depth of 2½m, broke into the base of the manhole and formed the backdrop in VC pipework and reformed the granolithic benching. Other work on the site consisted of running connections to and forming the road gullies in the bellmouth, constructing precast concrete catchpits and kerb inlet Beany drains.

Duration

20 Weeks